Monomark Engineering IPO: ₹60-65 band, 3.1x order book cover

Steel fabrication yard with gantry cranes with Monomark Engineering logo

Synopsis: Rajasthan-based Monomark Engineering has set a ₹60-65 price band for its ₹175.5 crore all-fresh mainboard IPO opening on 2 December. EQMint’s math shows an order book of about 3.1 times FY26 revenue, a price of roughly 24 times FY26 earnings after dilution, and thinner margins in the June quarter.

Monomark Engineering (India) Ltd, an industrial operations and maintenance (O&M), fabrication and project execution company based in Chittorgarh, Rajasthan, has fixed the price band for its initial public offering at ₹60 to ₹65 per share. The details were announced on 25 November 2026. The shares are proposed to be listed on BSE and NSE.

The IPO is an entirely fresh issue of 2.70 crore equity shares of face value ₹10, worth ₹175.50 crore at the upper end of the band. There is no offer for sale, so all the money raised goes to the company.

Key dates and issue details

  • Anchor book: 1 December 2026
  • Issue opens: 2 December 2026; closes: 4 December 2026
  • Allotment: 7 December; refunds and demat credit: 8 December
  • Tentative listing: 9 December 2026
  • Lot size: 225 shares, or ₹14,625 at the upper band
  • Reservation: up to 50% for qualified institutional buyers, at least 35% for retail investors and at least 15% for non-institutional investors
  • Book running lead manager: Holani Consultants; registrar: Bigshare Services

Of the proceeds, ₹120 crore is earmarked for incremental working capital, with the balance for general corporate purposes. That means about 68% of the issue is going into working capital, which fits a business that runs long contracts at client plants.

EQMint analysis: order book, margins and the price tag

EQMint used the restated consolidated financials disclosed for the IPO to look beyond the headline numbers. All ratios below are EQMint calculations.

₹ crore FY24 FY25 FY26 Q1 FY27 (Jun)
Total income 392.14 477.29 564.74 142.82
Profit after tax 14.83 18.21 25.90 3.02
PAT margin 3.8% 3.8% 4.6% 2.1%
Borrowings / net worth 1.33x 1.16x 0.75x 0.77x

Source: EQMint calculations from restated consolidated financials as listed on Chittorgarh’s Monomark Engineering IPO page and Kotak Neo, as of 26 November 2026.

  • Growth: Total income grew at a compound annual rate of about 20% between FY24 and FY26, while profit after tax grew about 32% a year, so margins widened over the two years.
  • Weaker June quarter: The PAT margin fell to 2.1% in April-June 2026, less than half the FY26 level of 4.6%. Quarterly income of ₹142.82 crore was in line with the FY26 run rate, so the pressure was on profit, not sales.
  • Order book cover: As of 30 September 2026, the company reported an unexecuted order book of ₹1,76,192.16 lakh, or about ₹1,762 crore, from 28 ongoing projects. That is about 3.1 times FY26 total income.
  • Valuation at the upper band: With 9.60 crore shares after the issue, the FY26 profit of ₹25.90 crore works out to earnings per share of about ₹2.70. At ₹65, that is about 24 times FY26 earnings on the post-issue share count (about 22 times at ₹60).
  • Promoter stake: Promoters, led by Narendra Chordia, hold 91.37% before the issue. This falls to 65.69% after the fresh issue.

What Monomark Engineering does

Incorporated in 2005, Monomark Engineering works in three segments: industrial O&M, metal fabrication, and industrial project execution, including fabrication and erection work. Its fabrication facility at Kapasan in Chittorgarh district has an annual capacity of 4,000 tonnes, and the company has a fleet of 232 industrial vehicles and equipment.

The company operates in seven Indian states and has a UAE subsidiary, Monomark Engineering FZE. Its client list includes companies from the Vedanta, Adani, Aditya Birla, L&T, Tata, JK Lakshmi Cement and Shree Cement groups. Of its 28 ongoing projects, 21 are O&M contracts and seven are project execution jobs. The company has a workforce of 7,608, of whom 6,650 are hired for specific projects.

Monomark joins a busy line-up of issues in early December. EQMint’s upcoming IPOs tracker lists more offers in the pipeline, and our coverage of the Mahanadi Coalfields IPO subscription shows how institutional demand has shaped recent mainboard books.

What happens next

The anchor book on 1 December will be the first test of institutional demand. Subscription data by category will be published by the exchanges during the 2-4 December bidding window. Investors who want more detail on contract terms, client concentration and risks should read the red herring prospectus filed with SEBI and the exchanges.

Image credit: AICreate / EQMint (representational); logo: Monomark Engineering (official website).

Sources

Disclaimer: This article is for information purposes only and is not investment advice.

For more such information, visit EQMint

Join our WhatsApp channel for timely updates: Whatsapp

Support EQMint: tap below to add us as a preferred source on Google.

Get the EQMint Daily

Market moves, IPOs and startup funding news in your inbox every morning.

Advertisement

The market and startup brief

Join 50,000+ professional readers.

eqmint